00:00 Slide 11: A plant with two optional lines 00:26 Slide 12: Capacity and resource data 00:53 Slide 13: Separate production from opening 01:22 Slide 14: Linking constraint: a ≤ 6yA 01:49 Slide 15: An optional minimum production level 02:18 Slide 16: Logic with binary variables 02:47 Slide 17: The complete baseline MILP 03:18 Slide 18: Verify by enumerating opening choices 03:50 Slide 19: Audit the chosen production plan 04:21 Slide 20: Choose a meaningful upper bound